Pricing


Total Votes: 13 / Interest: 1036

OPEN AN ACCOUNT-$5.00 MEMBERSHIP FEE
                                 $28.00 CONNECTION FEE
                                 DEPOSIT DETERMINED BY CREDIT CHECK ($0.00, $200.00 OR $300.00)                           

MINIMUM BILL RESIDENTIAL - $16.00

RELOCATE SECURITY LIGHT POLE - $45.00

RELOCATE SERVICE POLE - $50.00

SINGLE PHASE PRIMARY LINE EXTENSION …..2 SPANS @ NO COST….APPROX 800’

BEYOND 2 SPANS - PRI TAP - $1500.00 PER SPAN (SPAN = APPROX 400’) -
30’ EASEMENT REQUIRED

THREE PHASE PRIMARY LINE EXTENSION …..2 SPANS @ NO COST….APPROX 800’

BEYOND 2 SPANS – THREE PHASE PRI TAP - $3000.00 PER SPAN (SPAN = APPROX 400’) 30’ EASEMENT REQUIRED

TRENCHING CHARGES
SPEC WILL DO ALL TRENCHING - TRENCH IS 36” DEEP

ALL ELECTRIC RESIDENCE- $250.00 FOR A 100 FT. MINIMUM AND $2.50 PER FT. THEREAFTER.

NOT ALL ELECTRIC-$5.00 PER FT. WITH A 100 FT. MIMIMUN OR $500.00 AND $5.00 PER FT. THEREAFTER.

 

CONVERTING EXISTING OVERHEAD SERVICE TO UNDERGROUND SERVICE
NO UPGRADE- $6.55 FT-100 FT. MINIMUM

WITH UPGRADE- SAME AS TRENCHING CHARGES ABOVE.

 

SECURITY LIGHTS

50W LED  $7.50                                                       


400 WATT METAL HALIDE (WHITE) $15.75

400 WATT HPS (ORANGE) $15.75

1000W METAL HALIDE (WHITE) $30.75                        

SECURITY LIGHT POLE AIDE-TO-CONSTRUCTION - $100.00

 

METER POLE – MUST BE 20’ TALL…..4’ IN THE GROUND, 5” DIAMETER

SEASONAL ACCOUNTS- At the time disconnect service is requested, let the member know that we will retire this service. If the member will want the service back later, then let the member know when they call in for reconnect they will be charged a minimum bill for all the months the service was left in place with no usage.

Click Here to Learn More